CMM 2017-02 13-14

Source:
Status: Active
Effective From
Requirement for Inspection report to be provided if inspection is undertaken by Port CCM
Full Text

13. If an inspection, as per paragraph 12, is undertaken by the port CCM, a report on the outcome (inspection report) shall be provided to the requesting CCM, to the flag CCM and to the Executive Director as soon as practicable, and in any case within 15 days of such request. Where a port CCM cannot provide a report within 15 days, that port CCM shall notify the requesting CCM, flag CCM and the WCPFC Executive Director of the expected date that the inspection report will be provided.
14. On completion of an inspection, the port inspector shall provide a copy of an interim report on the vessel inspection to the vessel master prior to leaving the vessel.

Theme
Inspection activity related requirement
Sub Theme
Port State measures
Category / CMR Section
Report
Implementation (Evaluation Criteria Not Required)
Category: Report
Version Introduced Date:
Version:
1
Audit Point Definition
The Secretariat confirms through the relevant requesting CCM and the port CCM that a port inspection report was provided, where requested.
CCM limits not applicable for this obligation
Category: Report
CMS Compliance History
When Evaluated:
Average Score:N/A
Likelihood of Non-Compliance:
Moderate
Consequence of Risk Ratings
CCM or collective group Consequence of Non-Compliance Risk of Non-Compliance
European Union
Serious
Philippines
Moderate
Moderate
Category: Implementation
CMS Compliance History
When Evaluated:
Average Score:N/A
Likelihood of Non-Compliance:
Moderate
Consequence of Risk Ratings
CCM or collective group Consequence of Non-Compliance Risk of Non-Compliance